Fanpce Technique for Risk Assessment on Subway Station Construction

Abstract: Risk assessment is critical for the construction of the subway station to improve the risk management and reduce the additional loss. According to field investigation of safe construction, the analytical network process (ANP), fuzzy set theory and fuzzy comprehensive evaluation (FCE), a fuzzy ANP comprehensive evaluation (FANPCE) model was proposed to evaluate the risk of subway station construction in this paper. Twelve key risk factors of subway station construction were identified through literature review … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
7
0

Year Published

2020
2020
2022
2022

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 10 publications
(7 citation statements)
references
References 49 publications
(62 reference statements)
0
7
0
Order By: Relevance
“…Therefore, the evaluation result of man risk is consistent with the actual situation of the project. As a participant in the construction of engineering projects, man risk factors not only exist in the construction of traditional subway stations (Wu et al. , 2019) but also significantly affect the construction safety of prefabricated subway stations.…”
Section: Resultsmentioning
confidence: 99%
“…Therefore, the evaluation result of man risk is consistent with the actual situation of the project. As a participant in the construction of engineering projects, man risk factors not only exist in the construction of traditional subway stations (Wu et al. , 2019) but also significantly affect the construction safety of prefabricated subway stations.…”
Section: Resultsmentioning
confidence: 99%
“…Meanwhile, ANP and Bayesian network (BBN) can be used to explore the interactions among risks and evaluate the risk state quantitatively, while they require large amounts of data. Wu et al quantify the risk level of a subway station construction using fuzzy ANP via the synthesis of weight matrices, which requires much more computation for pairwise comparison between risk factors [46,47]. BBN performs excellently to model complex relationships among risks on the bases of the conditional probabilities of the nodes [48].…”
Section: Risk Assessment Methods In Megaprojectsmentioning
confidence: 99%
“…So, with the need for improved performance in the construction industry, the requirement of a practical risk management approach is imperative (Shi et al , 2008). Furthermore, risk assessment is critical for the construction to improve risk management and reduce the additional loss because the critical risk factors significantly affect the success of construction projects (Tawalare and Iop, 2018; Wu et al , 2019). So, what are the various risk factors affecting tertiary education building projects?…”
Section: Literature Reviewmentioning
confidence: 99%