All Days 2004
DOI: 10.4043/16527-ms
|View full text |Cite
|
Sign up to set email alerts
|

Falcon Corridor: Infrastructure with Future Marginal Fields in Mind

Abstract: The original Falcon Field consisted of two subsea development wells in a water depth of 3450 feet tied back 32.6 miles to a new host platform in a water depth of 389 feet Shortly before first production at Falcon, the Harrier discovery was made. Two additional discoveries (Tomahawk and Raptor) occurred during the Harrier development.Although the Falcon field was large enough to justify the long distance tie-back to a new host facility, Harrier, Tomahawk and Raptor were dependent upon a readily available and fl… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2020
2020
2021
2021

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
references
References 0 publications
0
0
0
Order By: Relevance