2017
DOI: 10.1051/matecconf/201712805013
|View full text |Cite
|
Sign up to set email alerts
|

Factory-like Optimum Drilling Design of Cluster Well in Jimsar Well Block

Abstract: Abstract. The deep heavy oil reservoir of Jimsar well block, which located in Xinjiang oilfield, was developed by cluster well in 2016. In view of the ground environment, long open hole section and poor wellbore stability, the scheme which based on the research of factory-like wellsite platform deployment, well trajectory design and reservoir protection, was designed and carried out in the block. Firstly, the platform was divided into different control regions according to the anti-collision requirement. Secon… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 5 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?