2019
DOI: 10.1007/s12205-019-0447-x
|View full text |Cite
|
Sign up to set email alerts
|

Factors influencing Time and Cost Overruns on Freeform Construction Projects

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

1
9
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 38 publications
(15 citation statements)
references
References 19 publications
1
9
0
Order By: Relevance
“…Ramanathan et al, 2012;C. T. Ramanathan et al, 2011;) Pakistan 9 (Afzal et al, 2019;Akram et al, 2017;Choudhry et al, 2014Choudhry et al, , 2018Choudhry & Rehman Nasir, 2012;Hanif et al, 2016;Maqsoom et al, 2018;Samiullah Sohu et al, 2017;Zafar et al, 2016) China 6 (Afzal et al, 2019;Lou & Yin, 2010;Ma, 2011;Mansur et al, 2019;Wang & Yuan, 2011;Yuanyue & Huimin, 2018) Ghana 5 (Asiedu et al, 2017;Asiedu & Adaku, 2019;Coffie et al, 2019) Nigeria 4 (Akinradewo et al, 2019;Akinsiku et al, 2014;Amadi & Higham, 2019;Amusan et al, 2018;Hingham, 2016) Saudi Arabia 4 (Alghonamy, 2015;Mahamid, 2013Mahamid, , 2018Seddeeq et al, 2019) South Africa 4 (Khabisi, 2012;Monyane et al, 2018;Mulalo et al, 2018 (Jung et al, 2016;Kavuma et al, 2019;Qiao et al, 2019) Vietnam 3 (S. Kim et al, 2017;S. Y. Kim et al, 2018;Pham et al, 2020) Others 21 (Afzal et al, 2019;Al-hazim et al, 2017;Alzebdeh et al, 2015;Apolot & Tindiwensi, 2013;…”
Section: Synthesis Of Resultsmentioning
confidence: 99%
“…Ramanathan et al, 2012;C. T. Ramanathan et al, 2011;) Pakistan 9 (Afzal et al, 2019;Akram et al, 2017;Choudhry et al, 2014Choudhry et al, , 2018Choudhry & Rehman Nasir, 2012;Hanif et al, 2016;Maqsoom et al, 2018;Samiullah Sohu et al, 2017;Zafar et al, 2016) China 6 (Afzal et al, 2019;Lou & Yin, 2010;Ma, 2011;Mansur et al, 2019;Wang & Yuan, 2011;Yuanyue & Huimin, 2018) Ghana 5 (Asiedu et al, 2017;Asiedu & Adaku, 2019;Coffie et al, 2019) Nigeria 4 (Akinradewo et al, 2019;Akinsiku et al, 2014;Amadi & Higham, 2019;Amusan et al, 2018;Hingham, 2016) Saudi Arabia 4 (Alghonamy, 2015;Mahamid, 2013Mahamid, , 2018Seddeeq et al, 2019) South Africa 4 (Khabisi, 2012;Monyane et al, 2018;Mulalo et al, 2018 (Jung et al, 2016;Kavuma et al, 2019;Qiao et al, 2019) Vietnam 3 (S. Kim et al, 2017;S. Y. Kim et al, 2018;Pham et al, 2020) Others 21 (Afzal et al, 2019;Al-hazim et al, 2017;Alzebdeh et al, 2015;Apolot & Tindiwensi, 2013;…”
Section: Synthesis Of Resultsmentioning
confidence: 99%
“…Their cost estimate is mainly to provide a preliminary estimate for selecting a suitable contractor through a competitive bidding for construction. Kavuma et al [10] had identified the cost overrun risks in free-form projects. Most of them were closely related to free-form panel fabrication such as lack of project-specific customization of fabrication technologies, poorly defined project scope at the time of budgeting, inappropriate subcontractor selection for free-form facades, mistakes in quantities and cost estimate, and unclear specification or scope of work.…”
Section: Lessons Learnedmentioning
confidence: 99%
“…According to previous research, among the three types of the curved panels, the double-curved panel is very difficult to form, showing bigger quality discrepancy than the other two panel types, which makes free-form projects overall very complex, often harming their geometrical beauty [10]. While comprehensive research is necessary for supporting small/mid-scale contractors to understand the methods of measuring as-built quality of the curved panel, the behavior of each panel type, the limit of the panel materials, and the proper production methods for the materials, thereby enhancing their project quality management capacity, most of the research in the area of free-form buildings has focused on mass and rapid panel production with cutting edge CNC-based technologies and the geometric design of the curved façade with meagre insight into small free-form buildings [11].…”
Section: Introduction 1background and Purposementioning
confidence: 99%
“…The technique is applied to solve CPS constraints via team collaboration (Alsehaimi et al, 2014;Daniel et al, 2017;Kovvuri et al, 2016); -CPS planning and management: CPS planning and controlling of CPS has been examined. For instance, early project planning is the basis of CPS (Al Nas-seri & Aulin, 2016; Larsen et al, 2018) and schedule monitoring using control charts (Băncescu, 2016); -Factors affecting schedule: CPS Labour productivity (Huang et al, 2014), resources (Larsen et al, 2016), labour and personal issues, risks and uncertainties (Kavuma et al, 2019) are examined by previous studies as they are problems affecting project schedule; and -Time-cost-trade-off: Time-cost trade-off has been one of the most CPS research areas focusing on reduction of project duration with an optimal cost. For example, schedule compression using fast-tracking (i.e., overlapping of activities) for both linear and nonlinear projects (Ballesteros-Pérez et al, 2019) and crashing (Sonmez et al, 2016).…”
Section: Science Mapping Of Co-occurrence Of Abstractmentioning
confidence: 99%