2017
DOI: 10.1016/j.proeng.2017.08.055
|View full text |Cite
|
Sign up to set email alerts
|

Factor Analysis for Development of Construction Period Calculation Model in Apartment House Remodeling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
9
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 9 publications
(9 citation statements)
references
References 4 publications
0
9
0
Order By: Relevance
“…The assistive technology is defined as systems and components that allow individuals to perform functional tasks that they would not be able to perform without it, in a safe and accessible manner. The study explored the mixed reactions of the users for the remodeling projects, as Jongsik et al (2017) analyzed the literature and conducted interviews with remodeling experts to identify the factors affecting the duration of the construction phase of remodeling projects in Korea. The study concluded that the duration is mainly dependent on the experience of remodeling contractor, and the availability of comprehensive data on the requirements of the remodeling project.…”
Section: Previous Studiesmentioning
confidence: 99%
See 2 more Smart Citations
“…The assistive technology is defined as systems and components that allow individuals to perform functional tasks that they would not be able to perform without it, in a safe and accessible manner. The study explored the mixed reactions of the users for the remodeling projects, as Jongsik et al (2017) analyzed the literature and conducted interviews with remodeling experts to identify the factors affecting the duration of the construction phase of remodeling projects in Korea. The study concluded that the duration is mainly dependent on the experience of remodeling contractor, and the availability of comprehensive data on the requirements of the remodeling project.…”
Section: Previous Studiesmentioning
confidence: 99%
“…Changes demanded by project employers result in adding more time to the duration of the remodeling project, which consequently affect the budget allocations (Luu et al, 2009). These changes would also result in exceeding the budget allocated for the project (Jongsik et al, 2017). Thus, it is essential for project managers to control the allocated time and cost for the remodeling project, to avoid adding crews, or using the allocated contingency funds (Hosseinpour et al, 2022).…”
Section: Lifecycle Factors Affecting the Successful Delivery Of Remod...mentioning
confidence: 99%
See 1 more Smart Citation
“…Reconstruction is a suitable method for satisfying the needs of stakeholders such as building owners and residents; however, this method tends to be larger on a construction scale and costlier than remodeling [5,6]. Although remodeling may be disadvantageous that there are restrictions on changing the existing foor plan compared with reconstruction, it has the advantages of a short construction period, low cost, and environmental friendliness in terms of lower construction waste [7,8]. Terefore, the South Korean government has been encouraging remodeling rather than reconstruction, and regulations related to remodeling eligibility have been eased compared with those for reconstruction [9].…”
Section: Introductionmentioning
confidence: 99%
“…The estimated project duration also affects the project cost calculation and bid price evaluation (Irfan, Khurshid, Anastasopoulos, Labi, & Moavenzadeh, 2011;Jin, Han, Hyun, & Cha, 2016). However, estimating the project duration has been limited to the new construction of apartment buildings, and related research on renovation construction remains in its preliminary levels (Yoon, Jung, & Yu, 2017). Because renovation is a complex process and is highly uncertain (Thuvander et al, 2012); the normal project duration of renovation cannot be generalized.…”
Section: Introductionmentioning
confidence: 99%