2023
DOI: 10.1016/j.autcon.2022.104713
|View full text |Cite
|
Sign up to set email alerts
|

Facility layout design for modular construction manufacturing: A comparison based on simulation and optimization

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
3
0
1

Year Published

2023
2023
2024
2024

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 18 publications
(4 citation statements)
references
References 30 publications
0
3
0
1
Order By: Relevance
“…The delivery site layout design is one of the main challenges since it needs to be adapted to the characteristics of the construction site and its surroundings. On the other hand, when the building contractors uses some degree of off-site fabrication, the supply site layout is a strategic decision that is influenced, for instance, by the available space in the facility, the size and weight of the product produced affecting the convenience of transportation between stations, and the dependency between work stations (Yang and Lu, 2023).…”
Section: Production Process Characteristicsmentioning
confidence: 99%
“…The delivery site layout design is one of the main challenges since it needs to be adapted to the characteristics of the construction site and its surroundings. On the other hand, when the building contractors uses some degree of off-site fabrication, the supply site layout is a strategic decision that is influenced, for instance, by the available space in the facility, the size and weight of the product produced affecting the convenience of transportation between stations, and the dependency between work stations (Yang and Lu, 2023).…”
Section: Production Process Characteristicsmentioning
confidence: 99%
“…A study by [31] shows that logistic functioning is a prominent phase of pre-fabrication that require strategic planning between stakeholders, i.e., project managers, construction engineers, on-site supervisors, etc. The project manages to have an adequate complication related to an excessive amount of transportation costs that might impact on project's overall defined budget [32] .…”
Section: Chapter: 2 Literature Review Sustainable Constructionmentioning
confidence: 99%
“…Salah satu masalah yang dapat diselesaikan dengan menggunakan simulasi salah satunya adalah masalah antrian [7]. Berbagai penelitian dan kajian dilakukan dengan menggunakan metode simulasi sebagai salah satu teknik untuk memecahkan masalah [8]- [10]. Software Arena Simulation merupakan salah satu dari perangkat lunak yang bisa digunakan untuk secara visual merepresentasikan sebuah sistem antrian [11]- [14].…”
Section: Pendahuluanunclassified