2021
DOI: 10.1061/(asce)cf.1943-5509.0001569
|View full text |Cite
|
Sign up to set email alerts
|

Facility Defect and Cost Reduction by Incorporating Maintainability Knowledge Transfer Using Maintenance Management System Data

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
4
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 14 publications
(7 citation statements)
references
References 49 publications
0
4
0
Order By: Relevance
“…Importantly, the study proposes a method to involve maintenance concretely in earlier phases of the project (Ganisen et al , 2015), establishing the design requirements. The proposed CC process complements the research in other business areas and industries (Tolonen et al , 2017; Verrollot et al , 2017; Annunen et al , 2021) and highlights the importance of creating maintenance phase capabilities (Isoherranen and Majava, 2018) in the project design and construction phases (Love et al , 2004; Aapaoja and Haapasalo, 2014; Islam et al , 2021; Weeks and Leite, 2021). The study confirms the need to have a systematic stage-gate process in place to support an efficient project design phase (Ulrich and Eppinger, 2008; Cooper, 2011), but it also offers a new perspective on using it in the construction industry.…”
Section: Resultsmentioning
confidence: 70%
See 1 more Smart Citation
“…Importantly, the study proposes a method to involve maintenance concretely in earlier phases of the project (Ganisen et al , 2015), establishing the design requirements. The proposed CC process complements the research in other business areas and industries (Tolonen et al , 2017; Verrollot et al , 2017; Annunen et al , 2021) and highlights the importance of creating maintenance phase capabilities (Isoherranen and Majava, 2018) in the project design and construction phases (Love et al , 2004; Aapaoja and Haapasalo, 2014; Islam et al , 2021; Weeks and Leite, 2021). The study confirms the need to have a systematic stage-gate process in place to support an efficient project design phase (Ulrich and Eppinger, 2008; Cooper, 2011), but it also offers a new perspective on using it in the construction industry.…”
Section: Resultsmentioning
confidence: 70%
“…From a data management point of view, the biggest problem is weak data and information interoperability and flow through the whole project life cycle (Halttula et al , 2020). This increases the importance of managing (planning, organising, leading and controlling) the whole construction project properly from the design phase to maintenance phase (Weeks and Leite, 2021). Training and increased information availability are key for building the competencies of the organisation and decreasing resistance to change (Saaksvuori and Immonen, 2008; Lavy and Jawadekar, 2014).…”
Section: Literature Reviewmentioning
confidence: 99%
“…32 In the operation phase, strategies and methods to prevent water damage are mapping the building structure to make water leakages and other defects visible 55 and designing buildings that allow and facilitate maintenance. 42 The strategies and methods for the prevention of water damage focus on decision-makers, inspection and building techniques. Proven and tested solutions for active water damage prevention are fewer, even though some studies were found 34,54 that could be implemented in the design and operation phases.…”
Section: Strategies and Methods For Prevention Of Water Damagementioning
confidence: 99%
“…Asset managers are thus compelled to obtain condition data through estimates, commonly based on a limited number of parameters (e.g., age and theoretical lifespan; see, e.g., [9]), or through appraisals from third parties, resulting in a poor integration of these data in the overall maintenance strategies. This tendency led MEP to be the building trade where the highest number of defects are reported [10]. Clearly, then, implementing new methods to estimate these components' condition is key to improve buildings' occupants' comfort [11][12][13] and minimize repair costs, which can be substantial [10,14].…”
Section: Introductionmentioning
confidence: 99%
“…This tendency led MEP to be the building trade where the highest number of defects are reported [10]. Clearly, then, implementing new methods to estimate these components' condition is key to improve buildings' occupants' comfort [11][12][13] and minimize repair costs, which can be substantial [10,14].…”
Section: Introductionmentioning
confidence: 99%