All Days 2010
DOI: 10.2118/135102-ms
|View full text |Cite
|
Sign up to set email alerts
|

Extending Openhole Gravel Packing Capability: Initial Field Installation of Internal Shunt Alternate Path Technology

Abstract: High angle, openhole completions are often selected to maximize production and reserve capture from several non-homogeneous sand packages in a single wellbore. Many times, the wells will require some form of sand control. Standalone screen applications may often times be the most cost effective and simplest form of sand control, but the formation characteristics may dictate that a gravel pack is necessary. Circulating water packs, alpha-beta gravel packs, have been used worldwide, but may be challenged to achi… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
6
0

Year Published

2011
2011
2021
2021

Publication Types

Select...
4
1
1

Relationship

0
6

Authors

Journals

citations
Cited by 12 publications
(6 citation statements)
references
References 14 publications
(5 reference statements)
0
6
0
Order By: Relevance
“…With the success of the first installation of ISAPT screens in 2009 (Hecker 2010), all that remained was to finalize the qualification and field installation of the openhole packer.…”
Section: Packer Qualificationmentioning
confidence: 99%
“…With the success of the first installation of ISAPT screens in 2009 (Hecker 2010), all that remained was to finalize the qualification and field installation of the openhole packer.…”
Section: Packer Qualificationmentioning
confidence: 99%
“…There are two types of tubes used -transport tubes and packing tubes (Hecker et al 2010). Transport tubes transport the slurry from one screen joint to another along the whole completion and deliver it to packing tubes used for gravel packing.…”
Section: Alternate Path Screensmentioning
confidence: 99%
“…Alternate path approach is applied in gravel pack and frac-and-pack operations no matter open or cased hole, vertical or horizontal oriented wellbore (Ali et al 2002;Romero et al 2002;Hecker et al 2010). …”
Section: Alternate Path Screensmentioning
confidence: 99%
See 1 more Smart Citation
“…The initial installation of ISAPT was in a deepwater well off West Africa in 2009 (Hecker, 2010) where the screen was successfully deployed and fully gravel packed. Following that success, Shunt Zonal Isolation packers, together with ISAPT screens, were successfully installed in both an onshore land well in Chad (2010) and a deepwater well off the coast of West Africa (2011) (Hecker, 2011).…”
Section: Openhole Gravel Packing With Zonal Isolation (Spe 146361)mentioning
confidence: 99%