Abstract: Production from North Rankin A platform (NRA) aims to meet the objective of supplying contract gas/LNG whilst maximising the condensate yield. This paper describes current efforts to increase production of selected wells through an extension of tubing flow velocity limits. By doing so, condensate rich wells can be produced preferentially at higher rates and overall flexibility between wells with regards to maintaining contractual gas production can be improved. Arguments used to define a new lim… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

1994
1994
2023
2023

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…Should any significant amount of the screen or the openhole section not contribute to the inflow, then this velocity would quickly increase to a rate that might be considered unacceptable. 6 In order to help avoid this situation, it was decided to place a delayed release acid/oxidizer filtercake removal and breaker-fluid system in the openhole after the gravel pack in order to degrade the water based drilling fluid filter cake, including the sized CaCO 3 solids and polymers, in place. This was achieved by converting the gravel-pack service tool back to wash down system and then circulating down the work-string and through the wash-pipe to the end of the wash-pipe positioned close to the end of the screen / open hole.…”
Section: Completion Efficiency and Cleanupmentioning
confidence: 99%
See 1 more Smart Citation
“…Should any significant amount of the screen or the openhole section not contribute to the inflow, then this velocity would quickly increase to a rate that might be considered unacceptable. 6 In order to help avoid this situation, it was decided to place a delayed release acid/oxidizer filtercake removal and breaker-fluid system in the openhole after the gravel pack in order to degrade the water based drilling fluid filter cake, including the sized CaCO 3 solids and polymers, in place. This was achieved by converting the gravel-pack service tool back to wash down system and then circulating down the work-string and through the wash-pipe to the end of the wash-pipe positioned close to the end of the screen / open hole.…”
Section: Completion Efficiency and Cleanupmentioning
confidence: 99%
“…6 To minimize the risk of plugging the screens before the start of gravel-pack placement operations, the DIF was conditioned to reduce the size of the particles, mainly sized CaCO 3 , but the load was to be maintained to ensure that fluid density remained constant. Tailor-made quality-control devices consisting of a "mud bucket" and a "re-circulation loop," both fitted with a coupon of the premium screen filter media, was designed to confirm the treated DIF would not plug the screens.…”
Section: Well Bore Isolationmentioning