2019 IEEE Innovative Smart Grid Technologies - Asia (ISGT Asia) 2019
DOI: 10.1109/isgt-asia.2019.8880909
|View full text |Cite
|
Sign up to set email alerts
|

Exploiting Unused Capacity in the Grid

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2022
2022

Publication Types

Select...
2
2

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 14 publications
0
1
0
Order By: Relevance
“…Therefore, the authors of this paper identified the research problem in the form of the selection of the strategy for the LB grid based on a measurable factor. The grid PV capacity indicator was selected [24][25][26] for the LV grid operating in Poland. The power flow throughput limits of the LV grid were the subject of this research and the resulting evaluation, positive or negative, is a proposal for strategy development by the DSO.…”
Section: Introductionmentioning
confidence: 99%
“…Therefore, the authors of this paper identified the research problem in the form of the selection of the strategy for the LB grid based on a measurable factor. The grid PV capacity indicator was selected [24][25][26] for the LV grid operating in Poland. The power flow throughput limits of the LV grid were the subject of this research and the resulting evaluation, positive or negative, is a proposal for strategy development by the DSO.…”
Section: Introductionmentioning
confidence: 99%