2015 5th International Conference on Electric Utility Deregulation and Restructuring and Power Technologies (DRPT) 2015
DOI: 10.1109/drpt.2015.7432497
|View full text |Cite
|
Sign up to set email alerts
|

Experimental research on minimum approach distances and complex gaps for live working in substation

et al.
Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(3 citation statements)
references
References 3 publications
0
3
0
Order By: Relevance
“…In the first stage of the game, defense resources are allocated to CEs. Among them, certain defense resources are allocated to CEs (6,4), (4,6), (7,6), (6,7), (9,7), (7,9), (13,15), (15,13), (14,7), (7,14), (14,15), (15,14), (16,8), (8,16), (16,17), (17,16), (17,20), (20,17), (18,19), (19,18), (19,20), and (20,19). The failure probabilities p ij during attack are 0.769, 0.769, 0.769, 0.769, 0.769, 0.833, 0.833, 0.833, 0.833, 0.472, 0.472, 0.833, 0.833, 0.714, 0.714, 0.769, 0.769, 0.909, 0.909, 0.625, 0.625, 0.556, and 0.556, respectively.…”
Section: Simulation Experiments On the Three-stage Process Of Cpps At...mentioning
confidence: 99%
See 1 more Smart Citation
“…In the first stage of the game, defense resources are allocated to CEs. Among them, certain defense resources are allocated to CEs (6,4), (4,6), (7,6), (6,7), (9,7), (7,9), (13,15), (15,13), (14,7), (7,14), (14,15), (15,14), (16,8), (8,16), (16,17), (17,16), (17,20), (20,17), (18,19), (19,18), (19,20), and (20,19). The failure probabilities p ij during attack are 0.769, 0.769, 0.769, 0.769, 0.769, 0.833, 0.833, 0.833, 0.833, 0.472, 0.472, 0.833, 0.833, 0.714, 0.714, 0.769, 0.769, 0.909, 0.909, 0.625, 0.625, 0.556, and 0.556, respectively.…”
Section: Simulation Experiments On the Three-stage Process Of Cpps At...mentioning
confidence: 99%
“…To ensure the safe and stable operation of the power communication network, it is necessary to carry out maintenance on communication equipment [17,18]. During the maintenance process that does not meet the distance requirements for live working, maintenance personnel need to cut off the power supply of the optical cable in order to refurbish some equipment on the tower [19,20], resulting in the optical cable not working properly. Therefore, the impact of communication equipment maintenance on the communication network can be regarded as a source of faults and a controllable factor.…”
Section: Introductionmentioning
confidence: 99%
“…However, live working technology in substations is less mature compared to that in transmission lines. Previous work on substation's live working mainly focused on the minimum approach distance (MAD) and work procedures, and most of the work was conducted for voltage levels below 500 kV . Until now, research pertaining to live working in a 1000‐kV substation has not been reported.…”
Section: Introductionmentioning