Experimental Demonstration of an RF System for the X-Band Linear Collider

Abstract: Designs for a future X-band linear collider (NLC/GLC) require an rf unit that can produce 450 MW to feed eight 60 cm accelerator structures. The implementation of this rf unit is envisioned to include a dual-moded SLED-II pulse compression system, with a gain of approximately three at a compression ratio of four, followed by an overmoded transmission and distribution system. We describe the tunnel layout plan for these rf systems. The design, construction, and operation of a prototype system are a focus of the… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
2
0

Year Published

2004
2004
2004
2004

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 8 publications
0
2
0
Order By: Relevance
“…
The 8-Pack Project at SLAC is a prototype rf system whose goal is to demonstrate the high-power X-band technology developed in the NLC/GLC (Next/Global Linear Collider) program. In its first phase, it has reliably produced a 400 ns rf pulse of over 500 MW using a solidstate modulator, four 11.424 GHz klystrons and a dualmoded SLED-II pulse compressor [1]. In Phase 2, the output power of our system has been delivered into the bunker of the NLCTA (Next Linear Collider Test Accelerator) and divided between several accelerator structures for beam acceleration.
…”
mentioning
confidence: 99%
“…
The 8-Pack Project at SLAC is a prototype rf system whose goal is to demonstrate the high-power X-band technology developed in the NLC/GLC (Next/Global Linear Collider) program. In its first phase, it has reliably produced a 400 ns rf pulse of over 500 MW using a solidstate modulator, four 11.424 GHz klystrons and a dualmoded SLED-II pulse compressor [1]. In Phase 2, the output power of our system has been delivered into the bunker of the NLCTA (Next Linear Collider Test Accelerator) and divided between several accelerator structures for beam acceleration.
…”
mentioning
confidence: 99%
“…A prototype dual-moded SLED II system for the linear collider was built at NLCTA in 2003 as part of the Eight Pack Project [7]. After high-power processing this system for three weeks, 580 MW, 400 ns pulses were achieved, limited only by the available klystron power.…”
Section: Rf Distributionmentioning
confidence: 99%