2021
DOI: 10.3390/app11083617
|View full text |Cite
|
Sign up to set email alerts
|

Experimental and Numerical Investigation of the Effect of Integration of a Flooded-Bed Scrubber into a Longwall Shearer on Airflow along a Coal Mine Longwall Face

Abstract: Dust control is one of the most difficult challenges for underground coal mine operators, especially longwall mine operators. The most widely used dust control technologies at a longwall section are ventilation air and water sprays, whereas a continuous miner section has the added advantage of having a dust scrubber built into the continuous miner. To test the potential benefits of integrating a flooded-bed scrubber into a longwall shearer, the authors designed and built a dust scrubber system for a full-scale… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
1
0

Year Published

2022
2022
2025
2025

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(3 citation statements)
references
References 19 publications
0
1
0
Order By: Relevance
“…Wedding et al [78] present the conceptual design of a scrubber for dust collection in underground coal mines. Since their study, several researchers have developed various scrubber prototypes and dust sensors and analyzed their performance using CFD (Geortz et al [79]; Kumar et al [80]; Zhou et al [81]; Arya et al [82]). Chen et al [83] devise a new dust removal system and simulate a wet dust collection net using CFD.…”
Section: Mine Ventilation Systemsmentioning
confidence: 99%
“…Wedding et al [78] present the conceptual design of a scrubber for dust collection in underground coal mines. Since their study, several researchers have developed various scrubber prototypes and dust sensors and analyzed their performance using CFD (Geortz et al [79]; Kumar et al [80]; Zhou et al [81]; Arya et al [82]). Chen et al [83] devise a new dust removal system and simulate a wet dust collection net using CFD.…”
Section: Mine Ventilation Systemsmentioning
confidence: 99%
“…𝑀 π‘₯ (𝑖, 𝑗) = βˆ’πΎ β‹… 0.5 β‹… 𝐷 𝑠 β‹… 𝑃 𝑠 (𝑖, 𝑗) 𝑀 𝑦 (𝑖, 𝑗) = βˆ’π‘ƒ π‘₯ (𝑖, 𝑗) β‹… 𝑧 𝑀 + 𝑃 𝑦 (𝑖, 𝑗) β‹… 𝑋(𝑖) 𝑀 𝑧 (𝑖, 𝑗) = βˆ’πΎ β‹… 𝑃 π‘₯ (𝑖, 𝑗) β‹… 𝑦 𝑀 βˆ’ 𝑃 𝑦 (𝑖, 𝑗) β‹… 𝑋(𝑖) (7) where:…”
Section: Resistance To Mining With Cutting Picksmentioning
confidence: 99%
“…Currently, both selective cutting roadheaders (Figure 1a) [2,3] or continuous miners (Figure 1b) [4,5] and longwall shearers (Figure 1c) [6,7] mine the face with cutting heads. They are used not only in mining machines, but also in construction and road machinery, such as road milling machines (Figure 1d) [8,9] or excavators [10][11][12][13].…”
Section: Introductionmentioning
confidence: 99%