Experimental and numerical analyses on working performance of a high arch dam with deep-seated joints: Yebatan arch dam, China

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
2
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(3 citation statements)
references
References 23 publications
0
2
0
Order By: Relevance
“…The YBT hydropower station is located upstream of the Jinsha River and is the 7 th level in the 13-level development plan. The upstream station is the Bolo hydropower station, and the downstream station is the Lava hydropower station [53,54]. The station is located in the lower reaches of the Jinsha River at the mouth of the Jiaogou River, which marks the border between Baiyu County, Sichuan Province and Gongga County, Tibet (Fig.…”
Section: A Study Areamentioning
confidence: 99%
“…The YBT hydropower station is located upstream of the Jinsha River and is the 7 th level in the 13-level development plan. The upstream station is the Bolo hydropower station, and the downstream station is the Lava hydropower station [53,54]. The station is located in the lower reaches of the Jinsha River at the mouth of the Jiaogou River, which marks the border between Baiyu County, Sichuan Province and Gongga County, Tibet (Fig.…”
Section: A Study Areamentioning
confidence: 99%
“…Temperature load is one of the main loads of arch dam 34 . Recent studies show that the arch sealing temperature and residual temperature are the main sources of temperature load uncertainty 35 . In this paper, the arch sealing temperatures are treated as random variables to characterize the uncertainty of temperature load.…”
Section: Case Studymentioning
confidence: 99%
“…All of them have been in service for many years with detailed and reliable monitoring data obtained. From the research and analysis, the working performance of super-high arch dams at the initial stage of impoundment and operation is quite different from that under the design condition [1,2]. The reason is that in the current code [3,4], the influence of nonlinear temperature differences in the dam section is not considered in the temperature load during operation, and the predicted reservoir water temperature is quite different from the measured value.…”
Section: Introductionmentioning