2001
DOI: 10.1109/mper.2001.4311628
|View full text |Cite
|
Sign up to set email alerts
|

Experiences with Mixed Integer Linear Programming-Based Approaches in Short-Term Hydro Scheduling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
16
0
3

Year Published

2007
2007
2018
2018

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 49 publications
(19 citation statements)
references
References 20 publications
0
16
0
3
Order By: Relevance
“…In Refs. 3, 4, the HC is made linear in two sections, the first one starts in the minimal power output up to the power for best efficiency and the second one starts in the best efficiency up to the maximal power output. In Ref.…”
Section: Mathematical Models Of Power Plantsmentioning
confidence: 99%
See 2 more Smart Citations
“…In Refs. 3, 4, the HC is made linear in two sections, the first one starts in the minimal power output up to the power for best efficiency and the second one starts in the best efficiency up to the maximal power output. In Ref.…”
Section: Mathematical Models Of Power Plantsmentioning
confidence: 99%
“…In this article, the model for defining the optimal hydro profit is based on Ref. 4. The plant performance chart (PPC), that is, the relation between the water discharged and the energy produced, is represented through a concave piece‐wise linear approximation of the HC.…”
Section: Mathematical Models Of Power Plantsmentioning
confidence: 99%
See 1 more Smart Citation
“…Secondly, it is too conservative to evaluate load supply adequacy index by increasing generation at equivalent ratio to meet bus load growth. Hence, this article presents multi-level load sup-ply adequacy evaluation method, which evaluates load supply adequacy from bus, zone and system level, and integrates sensitivity factor based evaluation method and continuous security constrained generation optimization based evaluation method [3][4][5][6][7][8] to make the index more accurate reflect load supply adequacy of transmission network. Based on multi-level load supply adequacy evaluation, the online short term load supply adequacy evaluation system is designed and implemented.…”
Section: Introductionmentioning
confidence: 99%
“…Another attraction of LP approach is its capability to consider integer variables using mixed integer linear programming (MILP) technique. The MILP approach is mainly used for the unit commitment problem [38]- [40]. However, it eventually becomes a powerful technique for corrective switching and transmission planning [37], [41]- [42], since many power system control actions involve discrete variables, such as transmission line switching, shunt element switching, and transformer tap changing.…”
Section: Linear Programming (Lp) Methodsmentioning
confidence: 99%