“…There are 2 ways how to dismantle such components: to be cut to smaller pieces or to be handled as compact structures. Practical applications of these approaches can be summarized as follows [3,15]: Cut and disposein situ treatment, examples of realized projects: NPP Gundremmingen, Germany (SGs were filled with water, frozen and cut in situ with a band saw) [25], NPP Stade, Germany (cutting of the RPV in spent fuel basin using thermal and mechanical dismantling techniques) [16,17]. Pack and gotransport to an external treatment facility, examples of realized projects: transport of 4 SGs of NPP Stade to Studsvik Radwaste in Sweden, where decontamination, segmentation (using thermal and mechanical cutting tools) and melting were carried out [4,8,30], transport of the RPV from the NPP Rheinsberg to the Interim Storage North in the Greifswald site [31].…”