2014
DOI: 10.1007/s10749-014-0498-6
|View full text |Cite
|
Sign up to set email alerts
|

Experience of Implementing a PGU-200 MW Two-Boiler One-Turbine Unit at the South-West CHP

Abstract: The engineering solutions for PGU-200 MW unit, the electrical distribution system layout, and the results of implementing the SPPA-T3000 control system are presented. The results of performance adjustment confirm that the requirements by the System Operator of the Unified Power System are met. The organizational structure for operating personnel is described.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2015
2015
2015
2015

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
references
References 0 publications
0
0
0
Order By: Relevance