Experience in concreting the Toktogul'sk HES dam

Abstract: The Toktogul'sk Hydrocenter* is located on the Naryn River in a narrow canyon with steep (60-78*) slopes rising to 1200-1300 m above the dam's crest. The canyon's geological structure consists of limestones with developed lateral release cracks (to a depth of 50 m) and a system of intersecting tector~ic cracks. The high seismicity of the construction region (force 9-10) and the presence of potentially unstable blocks on the slopes required the implementation of a complex of undertakings [1] before the main wor… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
4
0

Year Published

1973
1973
1985
1985

Publication Types

Select...
5

Relationship

1
4

Authors

Journals

citations
Cited by 8 publications
(4 citation statements)
references
References 0 publications
0
4
0
Order By: Relevance
“…This feature leads to full mechanization of the concreting operations, as well as a considerable reduction in the number of vertical joints. This in turn, improves the monolithic nature of the structures [1,2]. At the same time, the number of horizontal construction joints is significantly increased.…”
mentioning
confidence: 93%
“…This feature leads to full mechanization of the concreting operations, as well as a considerable reduction in the number of vertical joints. This in turn, improves the monolithic nature of the structures [1,2]. At the same time, the number of horizontal construction joints is significantly increased.…”
mentioning
confidence: 93%
“…

To increase the overhaul time of the turbine bearings at the Kremenchug hydrostation the following measures were taken:

i. A front grout curtain and drainage in the foundation and canyon walls are the cutoff measures.The characteristic design features of the dam are the absence of cuts into the canyon walls, the use of an additional surcharge by water, and the presence of deformation joints between sections in the shape of a fan, which made it possible to direct the main load to the foundation of the structure and to provide independent deformation of each section [i, 2].The dam was constructed by the layer-by-layer method with sectioning into concreting blocks measuring 60 x 32 m in plan and 0.5-1 m high [3]. Balancing was carried out by the method and under the supervision of workers of the I. I. Polzynov Central Boiler and Turbine Research and Development Institute with consideration ofmechanical, electrical, and hydraulic imbalance.

2.

…”
mentioning
confidence: 99%
“…The dam was constructed by the layer-by-layer method with sectioning into concreting blocks measuring 60 x 32 m in plan and 0.5-1 m high [3]. Systematic filling of the reservoir began in August 1977.…”
mentioning
confidence: 99%
“…The correct organization of production" presupposes improvement in the plan of construction operations, 9 The maximum economic effect in multipurpose hydraulic construction can be obtained by radical improvement of construction operations. As a favorable example we can cite the use of the so-called Toktogul'sk method of pouring concrete, which enabled the Naryin Hydroelectric Station Construction Trust to increase labor productivity in 1971 by 128% while keeping the average wages at the 1970 level [9].…”
mentioning
confidence: 99%