2020
DOI: 10.1109/tste.2019.2950591
|View full text |Cite
|
Sign up to set email alerts
|

Expansion Planning Studies of Independent-Locally Operated Battery Energy Storage Systems (BESSs): A CVaR-Based Study

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
23
0

Year Published

2020
2020
2022
2022

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 28 publications
(23 citation statements)
references
References 29 publications
0
23
0
Order By: Relevance
“…In the presented model, apart from the electric energy storage systems, natural gas storage units are considered, too. According to the storage capacity, charge and discharge limitations, and also charge and discharge efficiency, the equations of electrical and natural gas storage units ∀t ∈ Ψ T can be shown as follows [34].…”
Section: ) Energy Storage Systemsmentioning
confidence: 99%
“…In the presented model, apart from the electric energy storage systems, natural gas storage units are considered, too. According to the storage capacity, charge and discharge limitations, and also charge and discharge efficiency, the equations of electrical and natural gas storage units ∀t ∈ Ψ T can be shown as follows [34].…”
Section: ) Energy Storage Systemsmentioning
confidence: 99%
“…Faced with uncertainties of regulation income caused by power spot price fluctuations and the prediction difficulty, CVAR is often used to assess market gains under certain risk appetite conditions [29, 30]. Taking a loss cost function f(x,y) as an example, the model principle of CVaR is given below.…”
Section: Aggregate Regulation Strategy Under the Power Spot Marketmentioning
confidence: 99%
“…Hemmati et al [14] modelled three time-scales of ESS operation: daily, weekly and seasonal, as three levels within the planning model. Several private investors in distributed ESS were considered by Saber et al [139]. The investors were differentiated by their treatment of risk and their zone within the transmission grid.…”
Section: Transmission System-level Essmentioning
confidence: 99%
“…Planning Solving Technique [20,22,23,30,43,46,[49][50][51]53,54,57,59,73,74,78,[88][89][90]105] [ 119,125,130,156] LP [1,16-18,20,25,32,33,35,44,47,50,52, 56-58,60,61,63,65,66,70-72,76,79-83, 86,92,94-96,100-102,104,106,107] [ 14,28,[109][110][111][112][113][114][115]117,121,122,126,127,131,[133][134][135][136][137]139,148,149,155,156,<...>…”
Section: Operationmentioning
confidence: 99%