Exergoeconomic analysis of Ihovbor Gas Power plant

Abstract: Exergoeconomic parameters of Ihovbor Gas Power plant were determined in this study. To achieve this, the exergy of each stream, the economic cost of the plant components, the exergetic costs of each stream and the exergoeconomic evaluation of each component were determined. The average exergy efficiency of GTs ONE, TWO, THREE and FOUR were found to be 59.32%, 60.83%, 59.80% and 60.38% respectively and it decreased with increase in ambient temperature. The exergy destruction cost was greatest in the combustor (… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2020
2020
2021
2021

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(4 citation statements)
references
References 12 publications
0
4
0
Order By: Relevance
“…Furthermore, the purchased equipment cost of each component as show in Table 3 such as compressor, combustion chamber and gas turbine were calculate by using data from Table 2 and Eq. (7)- (9). It was seen in Table 3 that the most expensive of purchase equipment cost is compressor $3,421,229.46 followed by the gas turbine $2,642,389.59 and the cheapest was combustion chamber $174,360.79 and the total of purchace equipment cost wass $6,237,979.84.…”
Section: Discussionmentioning
confidence: 99%
See 2 more Smart Citations
“…Furthermore, the purchased equipment cost of each component as show in Table 3 such as compressor, combustion chamber and gas turbine were calculate by using data from Table 2 and Eq. (7)- (9). It was seen in Table 3 that the most expensive of purchase equipment cost is compressor $3,421,229.46 followed by the gas turbine $2,642,389.59 and the cheapest was combustion chamber $174,360.79 and the total of purchace equipment cost wass $6,237,979.84.…”
Section: Discussionmentioning
confidence: 99%
“…It was used to determine the magnitude, location, cause of irreversibility and to discover the efficiency of the power plant components. The essence of this analysis is primarily for optimization of thermal energy system, which in this case is the power plant [1,[9][10][11][12][13]. Furthermore, in this study, exergy and economic analysis were combined and used to evaluate the accrued cost caused by irreversibility, including the cost of investment in each component.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Physical exergy flow as called thermo-mechanical exergy divided into two components as thermal and pressure exergy. When ideal gas relations and constant specific heat capacity are accepted, this terms could be determined as follows respectively [6]:…”
Section: Exergy Assessment Of Pw4000 Enginementioning
confidence: 99%