2024
DOI: 10.22146/jcef.9713
|View full text |Cite
|
Sign up to set email alerts
|

Excess Pore Pressure Migration Analysis Due to High Embankment Construction – Case Study East Kalimantan

Edwin Lie,
Paulus Pramono Rahardjo,
Martin Wijaya

Abstract: A 42-inch pipeline traverses a predominantly flat right-of-way (ROW), running from south to north in East Kalimantan. Adjacent to the ROW, a coal mine concession was located on the western side, while the Mahakam River lies a further 3 km to the east. A mining waste dump has been constructed since 2010, situated in an area underlain by soft alluvium soil (Qa). The waste was stacked, reaching heights of up to 75 meters, with its toe approximately 200 m from the edge of the ROW. In 2016, a failure occurred in th… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 15 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?