2018
DOI: 10.31026/j.eng.2018.07.08
|View full text |Cite
|
Sign up to set email alerts
|

Examining the Values and Principles of Agile Construction Management in Iraqi Construction Projects

Abstract: The avoidance of failure in construction projects is not an easy task, which makes the failure of the construction project to achieve its objectives a major problem experienced by all countries in the world, especially Iraq. Where nearly two-thirds of the construction projects in the world have been suffered by significant problems as an increase in the cost of the project, delay in the specified duration for execution, and stopping the project. Therefore it is required to study and apply new methods for manag… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
7
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
6
1
1

Relationship

1
7

Authors

Journals

citations
Cited by 16 publications
(7 citation statements)
references
References 0 publications
0
7
0
Order By: Relevance
“…These conditions have adverse effects on the country's economic growth and financial conditions. Although some previous studies conducted in Iraq attempted to understand the feasibility of the APM for the construction industry [37][38][39], it is also necessary to explore the potential benefits of the APM for the project and team performances in construction projects. In this study, we initially aimed to understand the applicability of the APM to the Iraqi construction industry via nine different factors (Fig.…”
Section: Discussionmentioning
confidence: 99%
See 2 more Smart Citations
“…These conditions have adverse effects on the country's economic growth and financial conditions. Although some previous studies conducted in Iraq attempted to understand the feasibility of the APM for the construction industry [37][38][39], it is also necessary to explore the potential benefits of the APM for the project and team performances in construction projects. In this study, we initially aimed to understand the applicability of the APM to the Iraqi construction industry via nine different factors (Fig.…”
Section: Discussionmentioning
confidence: 99%
“…The second, third, and fourth sections consist of the applicability of the APM in Iraq, potential benefits for team coordination, and positive effects on the project performance, respectively. While most questions in the second part were adopted from a previous study [38] conducted in Iraq only to explore the feasibility of the APM, we prepared other sections via an extensive literature review on agile methods. Questions were asked in a 5-point Likert Scale form (e.g., 1= very low, 2= low, 3= medium, 4= high, 5= very high).…”
Section: Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…It is also the response to change [19]. Agile Manifesto reported that there are four values and twelve principals that Agile methods are built upon them [20]. The best way to illustrate Agile management is through (Figure 1).…”
Section: Agile Managementmentioning
confidence: 99%
“…This tendency is a result of standard industry contracts and a legacy of litigation within the industry [9]. In most construction projects, best possible performance is unachievable with poor productivity resulting in time overrun and consequently cost escalation of the projects, because the construction is a risky industry with uncertainties due to many external and internal factors that influence the construction process [10]. The most important factors leading to time delays and cost/budget overruns are poor contract management, finance and payment problems, shortages of materials and changes in site conditions [11].…”
Section: Introductionmentioning
confidence: 99%