2023
DOI: 10.1038/s41598-023-35047-1
|View full text |Cite
|
Sign up to set email alerts
|

Evaluation on displacement risks of dismantling temporary lining in tunnel and optimization on temporary lining configuration

Huijian Zhang,
Kai Liu,
Pan Cao
et al.

Abstract: In tunnel engineering, the temporary lining is adopted as an effective countermeasure in mitigating tunnel failure potential, often featured by extra-large cross-sections and/or driven through weak ground conditions. However, dismantling temporary linings negatively impacts primary linings. In this paper, the comprehensive research is conducted on the displacement risk caused by dismantling temporary lining based on two alternative tunneling methods (TM-1 and TM-2). Besides, the following three influence facto… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 32 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?