2019
DOI: 10.1186/s40517-019-0126-7
|View full text |Cite
|
Sign up to set email alerts
|

Evaluation of the Lund deep geothermal exploration project in the Romeleåsen Fault Zone, South Sweden: a case study

Abstract: The bedrock of Skåne, the southernmost province of Sweden, has been targeted for geothermal feasibility studies since the late 1970s. An exploration project concerning the geothermal potential in the Romeleåsen Fault Zone was launched outside the town of Lund in 2001. Besides geophysical imaging of the thrust fault zone, the investigations included drilling and investigations of a 3701.8-m-deep exploration well, DGE-1, with the aim to find > 100 °C warm and hydraulically conductive fractured crystalline bedroc… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

2
19
0

Year Published

2020
2020
2022
2022

Publication Types

Select...
3
2
1

Relationship

1
5

Authors

Journals

citations
Cited by 9 publications
(21 citation statements)
references
References 26 publications
2
19
0
Order By: Relevance
“…Significantly lower values of ca. 60 mW•m -2 observed for the STZ/SKP are in good agreement with those reported in the adjacent tectonic units of the Baltic Shield (50-60 mW•m -2 from: Slagstad et al, 2009;Balling, 2013;Veikkolainen et al 2017;Rosberg and Erlström;.…”
Section: Sorgenfrei-tornquist-zone/skagerrak-kattegat-platformsupporting
confidence: 88%
“…Significantly lower values of ca. 60 mW•m -2 observed for the STZ/SKP are in good agreement with those reported in the adjacent tectonic units of the Baltic Shield (50-60 mW•m -2 from: Slagstad et al, 2009;Balling, 2013;Veikkolainen et al 2017;Rosberg and Erlström;.…”
Section: Sorgenfrei-tornquist-zone/skagerrak-kattegat-platformsupporting
confidence: 88%
“…Air rotary drilling was used before and mud rotary after whipstock installation, and in both cases larger drill bit sizes than in FFC-1 were used. Detailed information about the used drilling methods, drilling dimensions and the whipstock installation can be found in Rosberg and Erlström (2019). Totally, 21 drill bits were consumed before the whipstock installation and in average the drill bits lasted for 68 m. Three drill bits lasted more than 100 m and the longest distance drilled with one of the TCI roller cone bits was 152 m. It can also be seen in Fig.…”
Section: Resultsmentioning
confidence: 94%
“…Percussion drilling using air has been successfully used in the deep EGS-drillings in Espoo, Finland (e.g. Think Geoenergy 2019) and during the drilling of DGE-1 both air rotary drilling and the testing of percussion drilling were applied down to 3365 m, which is described in Rosberg and Erlström (2019). The main difference if the two drillings are compared with FFC-1 is that problems with water in ux is only reported from FFC-1.…”
Section: Resultsmentioning
confidence: 99%
See 2 more Smart Citations