2021
DOI: 10.1016/j.chemosphere.2020.128405
|View full text |Cite
|
Sign up to set email alerts
|

Evaluation of the fouling potential of sludge in a membrane bioreactor integrated with microbial fuel cell

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 20 publications
(2 citation statements)
references
References 49 publications
0
2
0
Order By: Relevance
“…Based on these results and those of earlier studies (Feng et al 2020, Li et al 2021, Yellappa et al 2020, a main schematic diagram and possible mechanisms of the simultaneous removal of complex organics and nitrogen from OBDS by the MFC were proposed, as presented in Fig. 10.…”
Section: Discussionmentioning
confidence: 73%
“…Based on these results and those of earlier studies (Feng et al 2020, Li et al 2021, Yellappa et al 2020, a main schematic diagram and possible mechanisms of the simultaneous removal of complex organics and nitrogen from OBDS by the MFC were proposed, as presented in Fig. 10.…”
Section: Discussionmentioning
confidence: 73%
“…Fouling occurs due to the accumulation of pollutants in wastewater and the formation of biofilms by activated sludge [ [11] , [12] , [13] ]. In recent years, many studies on the modification of membrane material by mixing zeolite into the membrane to increase the flux have been reported.…”
Section: Introductionmentioning
confidence: 99%