2009 Asia-Pacific Power and Energy Engineering Conference 2009
DOI: 10.1109/appeec.2009.4918344
|View full text |Cite
|
Sign up to set email alerts
|

Evaluation of Switching Overvoltage in 500 kV Transmission Line Interconnection Nam Theun 2 Power Plant to Roi Et 2 substation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
6
0

Year Published

2010
2010
2024
2024

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 10 publications
(6 citation statements)
references
References 4 publications
0
6
0
Order By: Relevance
“…Switching overvoltage is a primary importance in insulation co-ordination for extra high voltage (EHV) lines. The objective of simulating switching overvoltage is to help for a proper insulation co-ordination and would lead to minimize damage and interruption to service as a consequence of steady state, dynamic and transient overvoltage [20]. During the early stages of restoring high voltage overhead and underground transmission lines, concerns are with three related overvoltages: sustained power frequency overvoltages, switching transients (surges), and harmonic resonance.…”
Section: Study Of Transmission Lines Energizationmentioning
confidence: 99%
“…Switching overvoltage is a primary importance in insulation co-ordination for extra high voltage (EHV) lines. The objective of simulating switching overvoltage is to help for a proper insulation co-ordination and would lead to minimize damage and interruption to service as a consequence of steady state, dynamic and transient overvoltage [20]. During the early stages of restoring high voltage overhead and underground transmission lines, concerns are with three related overvoltages: sustained power frequency overvoltages, switching transients (surges), and harmonic resonance.…”
Section: Study Of Transmission Lines Energizationmentioning
confidence: 99%
“…Switching overvoltage is of a primary importance in insulation coordination for extra-high-voltage (EHV) lines. e objective of simulating switching overvoltage is to help for a proper insulation coordination and would lead to minimize damage and interruption to service as a consequence of steady-state, dynamic, and transient overvoltage [17]. During the early stages of restoring high-voltage overhead and underground transmission lines, concerns are with three related overvoltages: sustained power frequency overvoltages, switching transients (surges), and harmonic resonance.…”
Section: Transmission Line Energization Studymentioning
confidence: 99%
“…The objective of simulating switching overvoltage is to help for a proper insulation co-ordination and would lead to minimize damage and interruption to service as a consequence of steady state, dynamic and transient overvoltage [5][6][7][8][9].…”
Section: Introductionmentioning
confidence: 99%