2009
DOI: 10.1016/j.ijpe.2008.07.020
|View full text |Cite
|
Sign up to set email alerts
|

Evaluation of product customization strategies through modularization and postponement

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
49
0

Year Published

2011
2011
2024
2024

Publication Types

Select...
6
4

Relationship

0
10

Authors

Journals

citations
Cited by 81 publications
(49 citation statements)
references
References 37 publications
0
49
0
Order By: Relevance
“…Factors influencing postponement have been given considerable attention in the literature during the last ten years and include: sales fluctuation and product life cycles (Yang et al, 2004b), product customization (MacCarthy, 2013), the number of products (Su et al, 2005), product and process features such as decouplability, standardization and modularity of products and processes (Swaminathan and Lee, 2003;Skipworth and Harrison, 2004;Yang et al, 2004b), and product and process redesign (Brun and Zorzini, 2009). The majority of the studies on postponement enablers and barriers are limited to product and/or process configurations and their technical considerations.…”
mentioning
confidence: 99%
“…Factors influencing postponement have been given considerable attention in the literature during the last ten years and include: sales fluctuation and product life cycles (Yang et al, 2004b), product customization (MacCarthy, 2013), the number of products (Su et al, 2005), product and process features such as decouplability, standardization and modularity of products and processes (Swaminathan and Lee, 2003;Skipworth and Harrison, 2004;Yang et al, 2004b), and product and process redesign (Brun and Zorzini, 2009). The majority of the studies on postponement enablers and barriers are limited to product and/or process configurations and their technical considerations.…”
mentioning
confidence: 99%
“…The DP can be defined as the stage in the manufacturing value chain where a particular product is linked to a specific customer's order (Brun and Zorzini 2009). According to the location of the DP within the supply chain, the VBTO and the i-VBTO systems are based on a dynamic DP, which can change from a BTO configuration to a MTS configuration.…”
Section: Ofs Related To the Studymentioning
confidence: 99%
“…A comprehensive literature review (Brun & Zorzini, 2009;Fogliatto et al, 2012;Jose & Tollenaere, 2005) shows direct and indirect impact of modularity on MC. Additionally, it is emphasized that information flow and processing is a success factor of effectiveness.…”
Section: Product Modularity and Make-to-upgrade (Mtu) Strategymentioning
confidence: 99%