Evaluation of Outage and Surplus Power due to Forecast Error of Photovoltaic Generation Output

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
16
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
7

Relationship

3
4

Authors

Journals

citations
Cited by 19 publications
(16 citation statements)
references
References 3 publications
0
16
0
Order By: Relevance
“…Other approaches have been described in the literature [16][17][18][19][20][21][22][23][24] for predicting solar radiation from GPV data and extraterrestrial horizontal solar radiation intensity for the target period.…”
Section: Forecasting Using a Physical Model This Methodsmentioning
confidence: 99%
“…Other approaches have been described in the literature [16][17][18][19][20][21][22][23][24] for predicting solar radiation from GPV data and extraterrestrial horizontal solar radiation intensity for the target period.…”
Section: Forecasting Using a Physical Model This Methodsmentioning
confidence: 99%
“…Constraints taken into account pertain to operating reserve margin, demand-supply balance, upper and lower limits on the generator's output, LFC regulation capacity, and PV priority dispatching. 6 The constraint on demand-supply balance with regard to BESS charge/discharge is shown in Equation (21):…”
Section: Uc Of Thermal Generatorsmentioning
confidence: 99%
“…It should be added that in this paper, the LFC capacity is configured to secure 3% of the hourly average of power demand .…”
Section: Uc–edc–lfc Simulation Modelmentioning
confidence: 99%
“…As a preliminary study on the supply–demand management for the power system with massive PVCs installed, UC‐EDC–based model is used for investigating the effects of PVS output prediction error on the operation schedule for the following day, and so on . It is, however, a challenging task to properly assess the prediction errors of PVS output short‐cycle variation or ramp event with the computation time‐step of 30 min to 1 h of the model to be applied for the above.…”
Section: Introductionmentioning
confidence: 99%