2021
DOI: 10.1016/j.rsase.2021.100573
|View full text |Cite
|
Sign up to set email alerts
|

Evaluating the monetary environmental compensation over a Hydroelectric Power Plant based on opportunity cost simulation, GIS, and remote sensing images

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 41 publications
0
1
0
Order By: Relevance
“…However, the installation of this type of mega project in the Amazon usually cause changes in land cover [16]. These changes are related to alterations in population dynamics and complementary infrastructure, affecting the way of life of the local populations [17][18][19]. The construction of the THC became a milestone in the socioeconomic dynamics of the region, which caused labor mobility, forming labor markets in the border areas of natural resource extraction.…”
Section: Introductionmentioning
confidence: 99%
“…However, the installation of this type of mega project in the Amazon usually cause changes in land cover [16]. These changes are related to alterations in population dynamics and complementary infrastructure, affecting the way of life of the local populations [17][18][19]. The construction of the THC became a milestone in the socioeconomic dynamics of the region, which caused labor mobility, forming labor markets in the border areas of natural resource extraction.…”
Section: Introductionmentioning
confidence: 99%