2012
DOI: 10.7782/ijr.2012.5.3.103
|View full text |Cite
|
Sign up to set email alerts
|

Evaluating New Track Construction Costs of Two Different Options: Conventional Trains vs. Tilting Trains

Abstract: Infrastructure costs could be greatly reduced if the need for bridges and tunnels was reduced, or if the line could be shortened. Tilting trains might be a less costly alternative to building new tracks with large curve radii, because tilting trains can negotiate tighter curves without having to decrease their speeds. Tracks built for tilting trains would be cheaper, as they require fewer bridges and tunnels. This paper compares the construction costs of two different options for the new Dodam-Yeoncheong secti… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2014
2014
2015
2015

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
references
References 5 publications
0
0
0
Order By: Relevance