2022
DOI: 10.1007/s11600-022-00822-7
|View full text |Cite
|
Sign up to set email alerts
|

Evaluating lateral riverbank erosion with sediment yield through integrated model in lower Gangetic floodplain, India

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

0
4
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 49 publications
0
4
0
Order By: Relevance
“…Equation () shows that the hydraulic radius is jointly affected by the cross‐sectional area and wet perimeter, which vary with the water stage. Ghosh et al (2022) coupled the BSTEM and HEC‐RAS software and found that the boundary shear stress was linearly related to the water stage with a fitting error of R 2 = 0.8059. Therefore, a well‐done time step division plan should be able to reflect the correlation between boundary shear stress and water stage.…”
Section: Numerical Resultsmentioning
confidence: 99%
See 3 more Smart Citations
“…Equation () shows that the hydraulic radius is jointly affected by the cross‐sectional area and wet perimeter, which vary with the water stage. Ghosh et al (2022) coupled the BSTEM and HEC‐RAS software and found that the boundary shear stress was linearly related to the water stage with a fitting error of R 2 = 0.8059. Therefore, a well‐done time step division plan should be able to reflect the correlation between boundary shear stress and water stage.…”
Section: Numerical Resultsmentioning
confidence: 99%
“…Similar to previous studies (Duan et al, 2018; Ghosh et al, 2022; Zong et al, 2017), we used the MTT in the iterative operation to align the profile with reality. However, the BSTEM automatically uses the 17th node, Q, as the DTT.…”
Section: Numerical Resultsmentioning
confidence: 99%
See 2 more Smart Citations