2016
DOI: 10.1061/(asce)co.1943-7862.0001015
|View full text |Cite
|
Sign up to set email alerts
|

Evaluating Integrated Project Delivery Using the Project Quarterback Rating

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

1
63
0
2

Year Published

2017
2017
2023
2023

Publication Types

Select...
5
2
1

Relationship

1
7

Authors

Journals

citations
Cited by 88 publications
(66 citation statements)
references
References 13 publications
1
63
0
2
Order By: Relevance
“…In the United States, almost $1 billion is spent on construction per year, and about 30% of this amount is wasted [5]. What is so significant in this regard, is financial success of the construction projects; however, the self-centered behavior of stakeholders under the traditional systems results in not achieving the desired outcomes [6,7]. On the other hand, funds of large projects are limited; therefore, the industry's owners attempt to attract…”
Section: Introductionmentioning
confidence: 99%
“…In the United States, almost $1 billion is spent on construction per year, and about 30% of this amount is wasted [5]. What is so significant in this regard, is financial success of the construction projects; however, the self-centered behavior of stakeholders under the traditional systems results in not achieving the desired outcomes [6,7]. On the other hand, funds of large projects are limited; therefore, the industry's owners attempt to attract…”
Section: Introductionmentioning
confidence: 99%
“…In other words, products of expected performance should be verified during the project. Verifying project quality is performed through procedures such as quality guarantee, quality control, and project and product inspection (El Asmar et al, 2015). In the IPD-based projects, changes have been less and speed of performance has been more, and also project delivery time has been improved significantly.…”
mentioning
confidence: 99%
“…IPD Barriers (Chan et al, 2004), (Ballobin, 2008), (Ghassemi and Becerik-Gerber, 2011), (Shahhosseini, 2013), (Sommer et al, 2013), (Lee et al, 2013), (Nejati et al, 2014), (Collins and Parrish, 2014), (Zhang and Li, 2014), (El Asmar et al, 2015).…”
mentioning
confidence: 99%
“…Algumas pesquisas recentes HANNA;LOH, 2013LOH, , 2015FRANZ et al, 2016; HARPER; MOLENAAR; CANNON, 2016) demonstraram que o método de execução do empreendimento influencia no desempenho em relação ao prazo, custo, qualidade, quantidade de disputas judiciais, ambiente de colaboração entre os agentes e na satisfação do cliente.…”
Section: Justificativaunclassified
“…A importância desta pesquisa na área da Arquitetura e Urbanismo está no estudo de um tema que ainda está em vias de desenvolvimento. Várias pesquisas recentes na área de gestão e tecnologia da construção estão abordando a integração sob diferentes aspectos, como: sustentabilidade (MOLENAAR; SOBIN, 2009; MOLLAOGLU-KORKMAZ; SWARUP; RILEY, 2013); aplicação em setores além de edificações, como no caso de infraestrutura urbana (FRANCOM; ARIARATNAM; EL ASMAR, 2016); interação entre integração e BIM (SACKS;YALCINKAYA;SINGH , 2015;HERTOGH, 2017); e avaliação de métodos integrados em comparação aos demais processos de produção HANNA;LOH, 2013LOH, , 2015.…”
Section: Justificativaunclassified