2022
DOI: 10.47313/jig.v25i2.1915
|View full text |Cite
|
Sign up to set email alerts
|

Evaluasi Sistem Proteksi dan Koordinasi Relai Arus lebih Gedung Mall XYZ Menggunakan ETAP 19.0.1

Abstract: Large buildings require optimal electrical protection. Short-circuit events are the most common occurrences. If there is a short-circuit fault on one of the feeders, the circuit breaker whose position is upstream from the fault center must work ahead of the circuit breaker whose position is upstream from the short-circuit fault center. The problem that occurs in the XYZ Mall Building is the opposite. When there is a short circuit current, it will cut off the main connector. As a result, some of the building's … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0
1

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 6 publications
(10 reference statements)
0
0
0
1
Order By: Relevance
“…Energi listrik yang dipakai untuk tata udara akan lebih optimal bila peralatan bekerja dengan baik. Demi untuk efisiensi, indeks konsumsi energi sangat dibutuhkan untuk memonitor tingkat konsumsi energi dalam sebuah bangunan (Kusuma et al, 2022;Ruliyanta, Suwodjo Kusumoputro, et al, 2022), (Djauhari et al, 2022).…”
unclassified
“…Energi listrik yang dipakai untuk tata udara akan lebih optimal bila peralatan bekerja dengan baik. Demi untuk efisiensi, indeks konsumsi energi sangat dibutuhkan untuk memonitor tingkat konsumsi energi dalam sebuah bangunan (Kusuma et al, 2022;Ruliyanta, Suwodjo Kusumoputro, et al, 2022), (Djauhari et al, 2022).…”
unclassified