2003
DOI: 10.1016/s0029-5493(02)00346-1
|View full text |Cite
|
Sign up to set email alerts
|

European validation of the integral code ASTEC (EVITA)

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
7
0

Year Published

2004
2004
2017
2017

Publication Types

Select...
7
3

Relationship

0
10

Authors

Journals

citations
Cited by 33 publications
(8 citation statements)
references
References 0 publications
0
7
0
Order By: Relevance
“…In Europe, the development of the integral SA code ASTEC was carried by eight European countries from 2000 to 2003 [60]. The ASTEC code is composed of 10 modules to predict an entire SA sequence from the initiating event to fission product release out of the containment.…”
Section: Sa Analysis Codementioning
confidence: 99%
“…In Europe, the development of the integral SA code ASTEC was carried by eight European countries from 2000 to 2003 [60]. The ASTEC code is composed of 10 modules to predict an entire SA sequence from the initiating event to fission product release out of the containment.…”
Section: Sa Analysis Codementioning
confidence: 99%
“…Several codes for simulating an MCCI have been developed, such as TOLBIAC-ICB, ASTEC/MEDICIS, and COCO; these are used in order to estimate the timing or possibility of damage to the wall of the PCV for reactor safety evaluations [1][2][3]. Moreover, knowing the characteristics of the corium and MCCI products is important for decommissioning severely damaged reactors.…”
Section: Introductionmentioning
confidence: 99%
“…ASTEC code has progressively reached a larger European dimension through the European Commission Framework Programme projects: VASA (FP4) (Allelein et al, 2000), EVITA (FP5) (Allelein et al, 2003), SARNET (FP6) (Haste et al, 2009) and SARNET II (Severe Accident Research Network of Excellence) (FP7) (European Commission, 2008). Within these projects, and integrated in a series of other severe accident activities, the code has been validated over a large number of experimental programs performed in in-pile and out-of-pile facilities, at various scales.…”
Section: Introductionmentioning
confidence: 99%