2014
DOI: 10.1109/tpwrs.2013.2245923
|View full text |Cite
|
Sign up to set email alerts
|

European Electricity Market Integration With Mixed Market Designs—Part I: Formulation

Abstract: The integration of the day-ahead electricity markets in Europe shall lead to one multi-area market that will substitute the local/national ones. In view of the "target model" that will be enforced in all European markets in conjunction with their forthcoming coupling/integration, a centralized market splitting algorithm is implemented in this paper, respecting the standard market regulatory framework of power exchanges (PXs) and power pools, including 1) block offers/bids, linked block offers/bids, flexible ho… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
37
0

Year Published

2016
2016
2023
2023

Publication Types

Select...
8
1

Relationship

1
8

Authors

Journals

citations
Cited by 76 publications
(38 citation statements)
references
References 22 publications
0
37
0
Order By: Relevance
“…The day ahead market mechanism is followed in many countries such as Ireland, Greece and Poland [21]. In this framework, the electricity prices are set based on market clearing mechanism one day in advance of actual operating point.…”
Section: A Assumptionsmentioning
confidence: 99%
“…The day ahead market mechanism is followed in many countries such as Ireland, Greece and Poland [21]. In this framework, the electricity prices are set based on market clearing mechanism one day in advance of actual operating point.…”
Section: A Assumptionsmentioning
confidence: 99%
“…Besides these hourly orders, most exchanges also allow other, more complex, orders [46]. The most common one is a block order, which consists of quantities that are offered or requested in multiple hours at an average price limit and which has to be accepted completely or not at all.…”
Section: Hourly Piecewise Linear Market Resilience Functionsmentioning
confidence: 99%
“…The stochastic integrated market is formulated as a two-stage stochastic programming problem (3) in which day-ahead dispatch decisions anticipate the balancing recourse actions over a plausible range of uncertainty. For the sake of brevity, we present a compact formulation of model (3) emphasizing its main differences compared to the sequential approach.…”
Section: ) Stochastic Integrated Market (Stochm)mentioning
confidence: 99%
“…This reduced grid representation, where internal network is treated as a copper plate, may result into infeasible real-time power flows due to transmission congestion. Nevertheless, recent literature [2], [3] proposes alternative approaches to account also for the intra-zonal network feasibility, based on a centralized market-splitting algorithm that integrates diverse market designs, i.e., power pools or power exchanges.…”
mentioning
confidence: 99%