2017
DOI: 10.1007/s10064-017-1042-3
|View full text |Cite
|
Sign up to set email alerts
|

Estimation of geotechnical parameters using Taguchi’s design of experiment (DOE) and back analysis methods based on field measurement data

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
3
0
1

Year Published

2019
2019
2024
2024

Publication Types

Select...
5
1
1
1

Relationship

1
7

Authors

Journals

citations
Cited by 22 publications
(6 citation statements)
references
References 54 publications
0
3
0
1
Order By: Relevance
“…Field monitoring was carried out by setting up measuring devices on the ground surface and near buildings to measure their movements during tunnel construction [29]; [30]; [31]. This data was used to identify potential problems, update planning, optimize operations and minimize damage to buildings.…”
Section: Monitoring Systemmentioning
confidence: 99%
See 2 more Smart Citations
“…Field monitoring was carried out by setting up measuring devices on the ground surface and near buildings to measure their movements during tunnel construction [29]; [30]; [31]. This data was used to identify potential problems, update planning, optimize operations and minimize damage to buildings.…”
Section: Monitoring Systemmentioning
confidence: 99%
“…Various studies have been conducted on different aspects of tunneling-induced settlements and their effects on building damage. These studies were conducted using various methods, including empirical and theoretical methods, analytical approaches, numerical studies, physical modeling, and machine learning-based methods [3][4][5][6][7][8][9][10][11].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Atualmente, os pesquisadores selecionam principalmente o DoE com base na importância assumida dos fatores e o número desejado de experimentos (A. Alafaghani, A. Qattawi, 2018;F. Kolivand, R. Rahmannejad, 2018, C. Shen, L. Wang, W. Cao, L. Qian, 2007.…”
Section: Principais Usos Do Doeunclassified
“…To use the finite element method to model a deposit, is necessary to set a geomechanical design for it. For example, from the mining area to the surface if the surface subsidence is to be modeled (Fredrich et al, 2000;Kolivand & Rahmannejad, 2018;Paraskevopoulou et al, 2012). The design has to include the geometry of the ore deposit, the different geological layers that form it and their properties.…”
Section: Finite Element Methods (Fem) Applied To Underground Infrastr...mentioning
confidence: 99%