2012
DOI: 10.37649/aengs.2012.68158
|View full text |Cite
|
Sign up to set email alerts
|

Estimating Optimum Period of Time Between Maintenances by Using Monte Carlo Simulation Method

Abstract: This work aims to increase the availability of steam generation plant through modifying boiler maintenance plan by determining the optimum period of time between maintenances to achieve maximum availability via simulation approach. Applying simulation approach is an attempt to determine the optimum period of time between schedule maintenances to achieve maximum boiler availability. Therefore, PC program in visual basic language is designed as a tool to the implementation of availability simulation approach. It… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 4 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?