2001
DOI: 10.3189/172756401781819373
|View full text |Cite
|
Sign up to set email alerts
|

Estimate of uncertainties in avalanche hazard mapping

Abstract: ABSTRACT. The present work addresses the urgent demand for methods of quantifying the uncertainties inherent in the current procedures for avalanche hazard assessment. A Monte Carlo approach to hazard mapping is proposed for this purpose. This statistical samplinganalysis method allows us to evaluate the probability distributions of the relevant variables for avalanche hazard assessment ö essentially runout distance and impact pressure ö once the release variables and the model parameters are expressed in term… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
44
0
3

Year Published

2004
2004
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 29 publications
(47 citation statements)
references
References 6 publications
0
44
0
3
Order By: Relevance
“…As far as H 72i is concerned, regression analysis against altitude A i is used (e.g. Barbolini et al 2002). Therefore, homogenous scaling of the average at site i µ H 72i with altitude A i is used as a further criterion for homogeneity.…”
Section: Identification Of Homogeneous Regionsmentioning
confidence: 99%
See 1 more Smart Citation
“…As far as H 72i is concerned, regression analysis against altitude A i is used (e.g. Barbolini et al 2002). Therefore, homogenous scaling of the average at site i µ H 72i with altitude A i is used as a further criterion for homogeneity.…”
Section: Identification Of Homogeneous Regionsmentioning
confidence: 99%
“…Bründl et al, 2004;Fuchs et al, 2004;Fuchs and McAlpin, 2005;Keiler et al, 2006). The current approaches to avalanche hazard mapping couple avalanche dynamics modelling (Salm et al, 1990;Harbitz, 1998;Bartelt et al, 1999;Ancey et al, 2004) with statistical analysis of snow depth at the avalanche starting zone (Burkard and Salm, 1992;Hopf, 1998;Barbolini et al, 2002). In avalanche hazard mapping exercise, the T -years return period avalanches at a given site are computed and their run out zone and pressure are evaluated (e.g.…”
Section: Introductionmentioning
confidence: 99%
“…Celle-ci vise à utiliser au mieux l'ensemble des connaissances disponibles pour la caractérisation des aléas de référence. Elle a été portée notamment par Bozhinsky et al (2001) en Russie, Barbolini et Savi. (2001) en Italie et Meunier et al (2001) au Cemagref de Grenoble.…”
Section: A L'interface : La Place De Cette Thèseunclassified
“…A partir de 2001, des méthodes de simulation de type Monte Carlo ont été proposées pour la prédétermination des avalanches par de nombreux auteurs (Meunier et al 2001 ;Barbolini et Savi, 2001 ;Bozhinskiy et al, 2001 ;Chernouss et Fedorenko, 2001 ;Barbolini et Keylock, 2002 ;Barbolini et Cappabianca, 2003 ;Bozhinskiy, 2004). Ces approches partent toutes du constat que la distance d'arrêt n'est pas, contrairement à un débit de crue, une variable intrinsèque et qu'il est par conséquent nécessaire de simuler des avalanches fictives pour pouvoir déterminer un aléa de référence par interpolation.…”
Section: Les Méthodes Statistiques-dynamiques Et L'approche Conceptuelleunclassified
See 1 more Smart Citation