The 25th International Symposium on Automation and Robotics in Construction. ISARC-2008 2008
DOI: 10.3846/isarc.20080626.708
|View full text |Cite
|
Sign up to set email alerts
|

Errors of calculations in M/M/1/FIFO/N/F model with limited duration of shift

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2010
2010
2018
2018

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 4 publications
0
2
0
Order By: Relevance
“…Besides the construction of the ground-state mentioned above, the Strong Disorder Renormalization approach has been recently extended to construct the whole set of excited eigenstates via the RSRG-X procedure [9][10][11][12][13][14], or to obtain the effective dynamics via the RSRG-t procedure [15,16]. These two closely related procedures [17] actually identify iteratively the Local Integrals of Motion called LIOMs [18][19][20][21][22][23][24][25][26][27][28][29][30][31][32][33][34][35][36][37] that are known to characterize the Many-Body-Localized phase existing in some isolated random quantum interacting models (see the many recent reviews [38][39][40][41][42][43][44][45][46] and references therein).…”
Section: Introductionmentioning
confidence: 99%
“…Besides the construction of the ground-state mentioned above, the Strong Disorder Renormalization approach has been recently extended to construct the whole set of excited eigenstates via the RSRG-X procedure [9][10][11][12][13][14], or to obtain the effective dynamics via the RSRG-t procedure [15,16]. These two closely related procedures [17] actually identify iteratively the Local Integrals of Motion called LIOMs [18][19][20][21][22][23][24][25][26][27][28][29][30][31][32][33][34][35][36][37] that are known to characterize the Many-Body-Localized phase existing in some isolated random quantum interacting models (see the many recent reviews [38][39][40][41][42][43][44][45][46] and references therein).…”
Section: Introductionmentioning
confidence: 99%
“…In the case of works involving concrete, there is a need to lay and connect the mix portion still before cement starts setting. Therefore, an important element of the analysis involves determining the time taken from mixing the cement with water at the concrete plant until such times as it is laid and along with other batches of mix on site [17,19].…”
Section: Introductionmentioning
confidence: 99%