2013
DOI: 10.1007/978-88-470-2531-8_9
|View full text |Cite
|
Sign up to set email alerts
|

Erratum to: Risk Management

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2014
2014
2019
2019

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…Criteria selection is the beginning initiative for SCR evaluation. Borghesi and Gaudenzi (2013) mentioned that SCR can be evaluated on the basis of their priority and nature of actions required. Risk is considered as a function of expected loss and determined how often the risk will occur and by the severity of the risk.…”
Section: Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…Criteria selection is the beginning initiative for SCR evaluation. Borghesi and Gaudenzi (2013) mentioned that SCR can be evaluated on the basis of their priority and nature of actions required. Risk is considered as a function of expected loss and determined how often the risk will occur and by the severity of the risk.…”
Section: Methodsmentioning
confidence: 99%
“…Borghesi and Gaudenzi (2013) defined operational risk as the risk associated with the execution of a company’s business functions. Ghadge et al (2012) descried operational risk originated with operational events like disrupting information or material flow within the supply chain.…”
Section: Literature Reviewmentioning
confidence: 99%