All Days 2007
DOI: 10.4043/18716-ms
|View full text |Cite
|
Sign up to set email alerts
|

Erha and Erha North Development: Automatic Ultrasonic Inspection of Corrosion-Resistant Alloy Clad Steel Catenary Risers

Abstract: TX 75083-3836, U.S.A., fax 01-972-952-9435. AbstractThe Erha and Erha North Project utilizes a steel catenary riser (SCR) system to connect the floating production, storage, and offloading vessel (FPSO) to the subsea infrastructure. The system is a hybrid, composed of both steel and clad corrosionresistant alloy (CRA) pipe, with the CRA clad pipes located in the touch-down and hang-off areas of the SCRs. The CRA clad pipe sections are required to obtain satisfactory fatigue life due to the presence of CO 2 and… Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles