2010
DOI: 10.1016/j.wasman.2009.11.013
|View full text |Cite
|
Sign up to set email alerts
|

Environmental performance of construction waste: Comparing three scenarios from a case study in Catalonia, Spain

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
78
0
6

Year Published

2013
2013
2021
2021

Publication Types

Select...
4
4

Relationship

0
8

Authors

Journals

citations
Cited by 207 publications
(110 citation statements)
references
References 13 publications
0
78
0
6
Order By: Relevance
“…Wang et al (2014), Yuan (2011), Ekanayake andOfori (2004) and Osmani et al (2008) state that some aspects of project design indirectly contribute to on-site waste generation. According to the results of the questionnaire (Table 10), it is common during the design phase to consider the future reuse and/or recycling of construction elements and materials (x =3.88; σ=0.97), and to introduce elements and materials from earlier buildings (x =3.70; σ=1.06).…”
Section: Resultsmentioning
confidence: 99%
See 2 more Smart Citations
“…Wang et al (2014), Yuan (2011), Ekanayake andOfori (2004) and Osmani et al (2008) state that some aspects of project design indirectly contribute to on-site waste generation. According to the results of the questionnaire (Table 10), it is common during the design phase to consider the future reuse and/or recycling of construction elements and materials (x =3.88; σ=0.97), and to introduce elements and materials from earlier buildings (x =3.70; σ=1.06).…”
Section: Resultsmentioning
confidence: 99%
“…Although awareness is ranked as one of the most significant success factors for conducting effective C&D waste management (Lu and Yuan, 2010;Osmani et al, 2008;Begum et al, 2009), a lack of training and environmental awareness was also attributed to all project stakeholders (i.e. executive managers, technicians, site managers and workers).…”
Section: Section C Legal Framework For Candd Waste Managementmentioning
confidence: 99%
See 1 more Smart Citation
“…With respect to the EoL phase, in Spain most of the waste is currently disposed in landfills, thus occupying a volume which clearly exceeds the volume occupied by domestic waste [54]. However, directives and legislation to reduce and manage building and construction waste have been drawn up both at the European level and at the level of the Member States.…”
Section: Life Cycle Inventorymentioning
confidence: 99%
“…Among the waste management techniques are, recycling, incineration and composting are the common approaches. Wastes generated must be reduced or reused, unless the waste generated cannot be recycled, then applying incineration or landfill is the last resolution [6,7].…”
Section: Waste Managementmentioning
confidence: 99%