10th IEEE International Symposium on Object and Component-Oriented Real-Time Distributed Computing (ISORC'07) 2007
DOI: 10.1109/isorc.2007.34
|View full text |Cite
|
Sign up to set email alerts
|

Enterprise Job Scheduling for Clustered Environments

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2011
2011
2011
2011

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 2 publications
0
1
0
Order By: Relevance
“…For example, the nodes, A, B and C, have the weights, 5, 3, 2 respectively, a good scheduling sequence will be AABABCABAC in a scheduling period (mod sum (WI)). In the implementation of the weighted round-robin scheduling, a scheduling sequence will be generated according to the node weights after the rules of cluster are modified [11] . The jobs are directed to the different nodes based on the scheduling sequence in a round-robin manner.…”
Section: Process Of Job Schedulermentioning
confidence: 99%
“…For example, the nodes, A, B and C, have the weights, 5, 3, 2 respectively, a good scheduling sequence will be AABABCABAC in a scheduling period (mod sum (WI)). In the implementation of the weighted round-robin scheduling, a scheduling sequence will be generated according to the node weights after the rules of cluster are modified [11] . The jobs are directed to the different nodes based on the scheduling sequence in a round-robin manner.…”
Section: Process Of Job Schedulermentioning
confidence: 99%