2011
DOI: 10.1016/j.jhazmat.2011.02.058
|View full text |Cite
|
Sign up to set email alerts
|

Enhancing simultaneous electricity production and reduction of sewage sludge in two-chamber MFC by aerobic sludge digestion and sludge pretreatments

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

3
32
0

Year Published

2012
2012
2024
2024

Publication Types

Select...
3
3

Relationship

1
5

Authors

Journals

citations
Cited by 89 publications
(37 citation statements)
references
References 28 publications
3
32
0
Order By: Relevance
“…The collected sludge samples were first filtered using a 40-mesh sieve to remove the larger particles and allowed to settle by gravity for approximately 1 h. The sediments were stored at 4 • C before use. The sewage sludge was adjusted to the appropriate concentration and then alkaline pretreated as discussed previously [19]. Some characteristics of the sewage sludge, alkaline pretreated sludge, anaerobic sludge and sludge mixture in the anode chamber are summarized in Table 1.…”
Section: Sewage Sludge and Alkaline Pretreatmentmentioning
confidence: 99%
See 4 more Smart Citations
“…The collected sludge samples were first filtered using a 40-mesh sieve to remove the larger particles and allowed to settle by gravity for approximately 1 h. The sediments were stored at 4 • C before use. The sewage sludge was adjusted to the appropriate concentration and then alkaline pretreated as discussed previously [19]. Some characteristics of the sewage sludge, alkaline pretreated sludge, anaerobic sludge and sludge mixture in the anode chamber are summarized in Table 1.…”
Section: Sewage Sludge and Alkaline Pretreatmentmentioning
confidence: 99%
“…The MFC was constructed as described previously using a 5 cm 2 proton exchange membrane (Nafion117) [19]. The 4 cm × 6 cm × 0.5 cm anode and 4 cm × 6 cm × 0.1 cm cathode were made of carbon felt (Sanye Carbon Co., China) and carbon paper without wet proofing (Toray Co., Japan), respectively, and were located 14 cm apart.…”
Section: Electricity Production From Alkaline Pretreated Sludgementioning
confidence: 99%
See 3 more Smart Citations