SPE Annual Technical Conference and Exhibition 1988
DOI: 10.2118/18072-ms
|View full text |Cite
|
Sign up to set email alerts
|

Enhanced Oil Recovery by Wet In-Situ Oxygen Combustion: Esperson Dome Field, Liberty County, Texas

Abstract: SPE Members Abstract A field test of wet in-situ oxygen combustion has been carried out in the Esperson Dome field in southeast Texas. The objectives of the pilot test were to evaluate the potential of oxygen combustion technology, to assess its advantages over air fireflooding, and to gain experience in the safe handling and downhole injection of high purity oxygen in an oil field environment. The Miocene sandstone chosen for the pilot is r… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
3
0
1

Year Published

1990
1990
2022
2022

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 9 publications
(4 citation statements)
references
References 5 publications
0
3
0
1
Order By: Relevance
“…Pebdani (1988) 5 describes the field trial of injecting oxygen into reservoir to combust with residual oil and generate fuel gas at Southeast Texas Esperson Dome formation. Compared with nitrogen injection, fuel gas injection is a more economical method to increase oil recovery.…”
Section: Spe 64724mentioning
confidence: 99%
“…Pebdani (1988) 5 describes the field trial of injecting oxygen into reservoir to combust with residual oil and generate fuel gas at Southeast Texas Esperson Dome formation. Compared with nitrogen injection, fuel gas injection is a more economical method to increase oil recovery.…”
Section: Spe 64724mentioning
confidence: 99%
“…Reports on in situ combustion field activities are scarce compared to reports on laboratory research. Reported field activities include oxygen-enriched combustion pilots (Hvizdos, 1983;Pebdani, 1988), performance review of ongoing combustion projects (Pebdani et al, 1989;Curtis, 1989), and postmortem analysis of terminated projects (Langley, 1985;Farquharson, 1985;Pate, 1988;Choquette, 1991).…”
Section: Current Status Of In Situ Combustion Field Projectsmentioning
confidence: 99%
“…The operational problems associated with enriched-air projects are similar to those encountered in nonenriched-air combustion projects, but are much more severe. These include injection well failure due to tubing leaks, production well failure due to casing collapse, severe corrosion of downhole equipment resulting from combustion products, and production of tight emulsified fluids that are difficult to treat (Pebdani et al, 1988;Langley, 1985).…”
Section: Current Status Of In Situ Combustion Field Projectsmentioning
confidence: 99%
“…Al estudiar experiencias previas en el uso de trazadores para EOR, y más específicamente en CIS, particularmente antes de la etapa de inyección de aire (Johnson, 1980;Hutchinson, 1979;Pebdani, 1988& Glandt, 1998 se formularon los objetivos de la PCN y se definió un diseño conceptual.…”
Section: Introductionunclassified