Engineering Support Systems for Industrial Machines and Plants

Abstract: In the business of industrial machines and plants, rapid and detailed estimates for planning installation or replacement of equipment, or maintenance work are key requirements for meeting the demands for greater reliability and lower costs, and for maintaining safe and secure operation. These engineering services should be supported by specific computer-aided methods. When replacing equipment at complex buildings or plants with high equipment density, the existing state of the installation locations and transp… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
2
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 28 publications
(44 reference statements)
0
2
0
Order By: Relevance
“…Essentially, construction processes have to be methodically planned and sequenced to achieve optimization of construction costs [5]. However, planning the installation of the substation equipment and sequencing it require experience and specialized knowledge [7]. Even though an effective cost and schedule control system is acknowledged to be of a paramount importance for delivering substation construction projects on time and within the budget [8], it has been found out that scheduling, definition of resources and tracking are the least practiced project considerations [9].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Essentially, construction processes have to be methodically planned and sequenced to achieve optimization of construction costs [5]. However, planning the installation of the substation equipment and sequencing it require experience and specialized knowledge [7]. Even though an effective cost and schedule control system is acknowledged to be of a paramount importance for delivering substation construction projects on time and within the budget [8], it has been found out that scheduling, definition of resources and tracking are the least practiced project considerations [9].…”
Section: Introductionmentioning
confidence: 99%
“…(1) enabling fully integrated construction process; (2) being an interactive environment for generating plans and designs, critique and evaluate proposals and for conflict resolution; (3) integrating all project stakeholders and participants; (4) supporting integrated framework spanning an entire project cycle; (5) displaying facility model in 3D for gaining a global view on the entire facility; (6) enabling Concurrent Engineering (CE);(7) providing feedback mechanisms and opportunities for innovation and optimization; and (8) providing mechanisms where collective skills of the participants are aimed at a common goal.…”
mentioning
confidence: 99%