2018
DOI: 10.1007/978-3-030-04293-6_25
|View full text |Cite
|
Sign up to set email alerts
|

Energy Storage Sizing and Optimal Operation Analysis of a Grid-Connected Microgrid

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2018
2018
2021
2021

Publication Types

Select...
2
1

Relationship

1
2

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 13 publications
0
1
0
Order By: Relevance
“…To obtain the real-time optimal control signals of the developed Model Predictive Controller (MPC), the stochastic dynamic programming (SDP) approach is used. In addition, some previous studies investigated the optimal scheduling of MGs, taking the peak shaving, valley filling, and BESS operation costs into consideration as significant contributors to the MG operating cost [16][17][18]. Authors in [19] inspect the optimal power flow in the grid-tied MG including renewables and distributed generation units by establishing a trade-off between the economic benefit and the reliability of the system.…”
Section: Introductionmentioning
confidence: 99%
“…To obtain the real-time optimal control signals of the developed Model Predictive Controller (MPC), the stochastic dynamic programming (SDP) approach is used. In addition, some previous studies investigated the optimal scheduling of MGs, taking the peak shaving, valley filling, and BESS operation costs into consideration as significant contributors to the MG operating cost [16][17][18]. Authors in [19] inspect the optimal power flow in the grid-tied MG including renewables and distributed generation units by establishing a trade-off between the economic benefit and the reliability of the system.…”
Section: Introductionmentioning
confidence: 99%