2009 International Conference on Management and Service Science 2009
DOI: 10.1109/icmss.2009.5305227
|View full text |Cite
|
Sign up to set email alerts
|

Energy Saving Potential of Public Building in Jiangbei District of Chongqing

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2010
2010
2024
2024

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…For the energy efficiency of buildings in cold regions, the body shape coefficient and the window-wall area ratio are two very important controlling indexes, but the energysaving renovation of existing buildings cannot be optimized and strengthened from the two aspects of the body shape and the window-wall area ratio. It can only be renovated based on the aspect of changing the thermal insulation measures of the enclosure structure [28]. Therefore, enclosure structures such as walls, roofs, doors, and windows were the focus of this study on energy-saving renovation.…”
Section: Objects For Energy-saving Optimization and Renovationmentioning
confidence: 99%
“…For the energy efficiency of buildings in cold regions, the body shape coefficient and the window-wall area ratio are two very important controlling indexes, but the energysaving renovation of existing buildings cannot be optimized and strengthened from the two aspects of the body shape and the window-wall area ratio. It can only be renovated based on the aspect of changing the thermal insulation measures of the enclosure structure [28]. Therefore, enclosure structures such as walls, roofs, doors, and windows were the focus of this study on energy-saving renovation.…”
Section: Objects For Energy-saving Optimization and Renovationmentioning
confidence: 99%
“…The design phase concerning the implementation of environmental, social and economic aspects, related to the building process requires grouping and coordination of several specialists from different disciplines (He et al , 2009; Hansen and Augenbroe, 2002). This phase is characterized by continuous verification activities of design choices, at different scales, throughout the design and building process.…”
Section: Introductionmentioning
confidence: 99%