2015
DOI: 10.1016/j.ijepes.2015.05.033
|View full text |Cite
|
Sign up to set email alerts
|

Energy procurement management for electricity retailer using new hybrid approach based on combined BICA–BPSO

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
9
0

Year Published

2017
2017
2022
2022

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 30 publications
(9 citation statements)
references
References 13 publications
0
9
0
Order By: Relevance
“…The common difficulty with solving the problems such as what described in 1, is the uncertainty of input parameters (Ψ). There are some techniques to model these uncertainties such as stochastic programming (SP) [27], fuzzy modeling [28] and robust optimization (RO) [29]. Each technique needs some information about the uncertain parameter.…”
Section: Uncertainty Modeling Via Igdtmentioning
confidence: 99%
See 1 more Smart Citation
“…The common difficulty with solving the problems such as what described in 1, is the uncertainty of input parameters (Ψ). There are some techniques to model these uncertainties such as stochastic programming (SP) [27], fuzzy modeling [28] and robust optimization (RO) [29]. Each technique needs some information about the uncertain parameter.…”
Section: Uncertainty Modeling Via Igdtmentioning
confidence: 99%
“…The relation between the predicted wind power (P W b,t ) and the uncertain wind power (P W b,t ) is described in (27).…”
Section: Uc Problem Formulationmentioning
confidence: 99%
“…In the second category, due to the non-linear nature of the problem and great technical complexity, the classical optimization approaches are neglected and heuristic search algorithms, e.g. Genetic Algorithm (GA) [21,22], Particle Swarm Optimization technique (PSO) [55] and Imperialist Competitive Algorithm (ICA) [55] are used to solve the problem.…”
Section: Optimization Solutionmentioning
confidence: 99%
“…In long-term scheduling, references [9,10] minimize total cost without pricing, DRP, smart meter technology and maximizing the anticipated benefit considering uncertainty modeling is proposed. Therewith, the review of studies related to medium-term scheduling shows that the objective function is minimizing cost [11,12], maximizing benefit [13][14][15]. Furthermore, the solution technique is based on hybrid heuristic algorithm or GAMS optimization package.…”
Section: Introductionmentioning
confidence: 99%