Abstract: The renewable energy sources are becoming more and more current in the energy supply of buildings, from residential buildings to institutional buildings. The renewable energy sources have proved to be a solution and an important element of the Romanian Energy System. We are starting from the idea of using the renewable sources to passivize a building, and we are relying on existing facilities in the Multidisciplinary Scientific and Technological Research Institute (ICSTM) from Valahia University of Targoviste … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
9
0

Year Published

2021
2021
2022
2022

Publication Types

Select...
3

Relationship

1
2

Authors

Journals

citations
Cited by 3 publications
(10 citation statements)
references
References 0 publications
0
9
0
Order By: Relevance
“…ICSTM is part of UVT, the building covers an area of 2240 m 2 , has a total built area of 7250 m 2 , and houses 40 laboratories, 6 functional annexes, 7 administrative spaces, and 4 communication spaces, with installations and equipment used for research [18].…”
Section: Methodsmentioning
confidence: 99%
See 3 more Smart Citations
“…ICSTM is part of UVT, the building covers an area of 2240 m 2 , has a total built area of 7250 m 2 , and houses 40 laboratories, 6 functional annexes, 7 administrative spaces, and 4 communication spaces, with installations and equipment used for research [18].…”
Section: Methodsmentioning
confidence: 99%
“…A detailed description of facilities related to RES real scale laboratories, namely, PV platform and wind platform, being at the same time sources of electricity for ICSTM's own consumption is presented by Nedelcu et al [18]; here, we will just shortly review these sources of energy from RES. It is to be mentioned that these sources partially cover the ICSTM's own consumption, the difference being supplied from the National Power System (NPS), and that one PV installation supplies electricity to the NPS.…”
Section: Methodsmentioning
confidence: 99%
See 2 more Smart Citations
“…In the last ten years, Romania installed more than 1300 MW in ground-mounted PV power plants. This Romanian experience in PV systems can be completed by the real scale laboratories, for example, those existing in Romanian technical universities, related to different PV cells and panels technologies [34], eventually integrated with other RES [35] and even analysis of the operation in difficult conditions [36].…”
Section: Introductionmentioning
confidence: 99%